⊴ PREV NEXT ⊵


Since each unit has both a power meter (RX) and a light source (TX) port, the technician will need four test cables to connect the testers in to the link under test – one for each light source port and one for each power meter port. It is also important to ensure that all the cables have the corresponding connector types.