⊴ PREV NEXT ⊵


Connect the meter and source in to the first fiber in the link.

Then, press TEST on the meter.

After a few seconds, the meter screen will be updated with certification results.

Green means pass

Red means fail

Blue indicates a potential procedural issue where the reference may not have been set properly. If this is the case, re-set the reference. The length will not need to be re-measured.