⊴ PREV NEXT ⊵


In this example, we are testing a CS1 horizontal link from the DC / MC / MDF out to one of the equipment outlets. As you can see, the only connections in this link are in the DC and the EO (none in between).

So the link budget would include 2 test cord connections and no mid-span connections.